Tenerife Job Training impulsa y desarrolla el Turismo Educativo en las Islas Canarias

      In 1941 after the end of the Spanish Civil War, the canarian arquitect José Enrique Marrero Regalado starts the construction of a leprosy hospital in Arico, east coat of Tenerife. The number of leprosy infected patients in Tenerife was over 200 people at the time and there was no treatment for this illness but the isolation of the patient aw...

Contact Us


Address:
C/Montaña Clara,5 Local 4
38660 Fañabé, Adeje.
Phone: [+34] 922 711 512
Email: info@tenerifejobtraining.com